Clockwork Phase 2 continues a multi-building residential community. Leonard Kalishenko and Associates delivered structural engineering for the mid-rise phase, coordinating with Phase 1 interfaces, shared site servicing, and a podium that supports amenity and residential floors above parking.

The engagement covered schematic through construction documents, with emphasis on efficient bay spacing, clean transfer strategies, and constructability for a phased urban site.

Project facts

Category
Multi-Storey
Subcategory
Mid-rise
Year
2024
Role
Structural Engineer of Record
Location
Mississauga, ON

Gallery

In motion

Overview

Project overview

Phase 2 mid-rise work sits on a podium that must reconcile parking grids with residential layouts above. Structural design prioritized a clear transfer story, economical floor systems, and lateral stability appropriate to mid-rise heights in the Greater Toronto Area.

Structural approach

Gravity systems combined cast-in-place or precast concrete elements with steel where schedule and spans favoured hybrid framing. Transfers were kept as shallow and regular as program allowed to protect amenity floor heights and parking clearances.

Lateral resistance was provided through shear walls and/or moment frames sized for wind, with diaphragm continuity checked at podium steps and expansion joints between phases. Balcony and terrace edges were detailed for thermal breaks without compromising structural capacity.

Delivery

Phased occupancy and site logistics informed erection sequencing notes and temporary condition checks. Construction administration covered shop drawings, connection revisions, and site reviews during podium pours and tower (mid-rise) framing.